Strona 1 - Smart-UPS

Smart-UPS® VT10-30 kVA208/220 VSite Preparation andInstallation Manual

Strona 2

4 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BUPS Family Range and Components13.85 in/352 mm Enclosures20.59

Strona 3 - VT 10-30 kVA 208/220 V

Introduction – UPS Family Range and Components990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 5Serial numberThe

Strona 4

Introduction – UPS Family Range and Components6 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BUser interface D

Strona 5 - Contents

Introduction – UPS Family Range and Components990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 7Display port for

Strona 6

Introduction – UPS Family Range and Components8 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BLower part of Co

Strona 7 - General Safety Instructions

Introduction – UPS Family Range and Components990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 9APC Network Manag

Strona 8 - General safety

10 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BSite Preparation Installation Space Requirements Clearance for

Strona 9 - Introduction

Site Preparation – Installation Space Requirements990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 11Clearance fo

Strona 10 - 20.59 in/523 mm Enclosures

12 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BOperating EnvironmentOperating conditionsHeat dissipationAudib

Strona 11 - Type label

Site Preparation – Operating Environment990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 13Recommended current pr

Strona 13 - Connection Interface (rear)

Site Preparation – Operating Environment14 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BMinimum breaker settin

Strona 14 - Foot print

Site Preparation – Operating Environment990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 15Recommended phase-cond

Strona 15 - (Optional)

16 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BBasic Wiring OverviewEPOMaintenanceBypass Panel(Optional Equip

Strona 16 - Site Preparation

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 17Site Preparation ChecklistSystem components. Have you –Site Pr

Strona 17 - Space requirements in mm

18 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BMechanical assemblyStabilizing BracketsAlways install the Stab

Strona 18 - Operating Environment

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 19Leveling Feet Setting the leveling feet Set the leveling feet

Strona 19 - Dual/single

20 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BFloor Anchoring Drilling floor holes for floor anchoringHole p

Strona 20

Mechanical assembly – Floor Anchoring990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 21Floor anchoring of stand-

Strona 21 - EPO switch wiring

22 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BElectrical InstallationSystem-Electrical InformationWARNING!Al

Strona 22 - Basic Wiring Overview

Electrical Installation – System-Electrical Information990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 23UPS rat

Strona 23 - Site Preparation Checklist

Smart-UPS® VT 10-30kVA, 208V, Site Preparation and Installation – 990-1598A 1Smart-UPS® VT 10-30 kVA 208/220 V Site Preparation and Installation Manua

Strona 24 - Stabilizing Brackets

Electrical Installation – System-Electrical Information24 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BSource

Strona 25 - Leveling Feet

Electrical Installation – System-Electrical Information990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 25One-lin

Strona 26 - Floor Anchoring

Electrical Installation – System-Electrical Information26 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BOne-lin

Strona 27 - Front Panel

Electrical Installation – Wiring990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 27Wiring NoteMake sure the UPS i

Strona 28 - Electrical Installation

28 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BInput/Output Wiring – Single Mains (default)The UPS is designe

Strona 29 - UPS ratings 220 V

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 29Loosen the (4) M4 screws (2 each side) from the bottom part o

Strona 30 - Source connections

30 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BInput/Output Wiring – Dual Mains The UPS is designed for singl

Strona 31

Electrical Installation – Input/Output Wiring – Dual Mains990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 31Pun

Strona 32

32 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BExternal Battery WiringWiring to battery bank or battery racks

Strona 33

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 33Communication Wiring to EPO and Optional EquipmentNoteEPO swit

Strona 35

Electrical Installation – Communication Wiring to EPO and Optional Equipment34 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Ma

Strona 36 - Wiring procedure – dual mains

Electrical Installation – Communication Wiring to EPO and Optional 990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manu

Strona 37

Electrical Installation – Communication Wiring to EPO and Optional Equipment36 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Ma

Strona 38 - External Battery Wiring

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 37Connection of APC Humidity SensorFront panel removalTo remove

Strona 39 - Optional Equipment

Electrical Installation – Connection of APC Humidity Sensor38 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BRe

Strona 40 - J108 Pin Connections:

Electrical Installation – Connection of APC Humidity Sensor990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 39Gu

Strona 41

40 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BWiring Verification ProcedureUse following procedure to verify

Strona 42

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 41Installation Site ChecklistThis checklist should be completed

Strona 43 - Front panel removal

*990-1598B*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of the following ways:• V

Strona 44 - AP9619 Network Management

Contents990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual iSafety ...

Strona 45

ii Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BBasic Wiring Overview . . . . . . . . . . . . . . . . . . . .

Strona 46 - Wiring Verification Procedure

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 1SafetyGeneral Safety InstructionsThis guide contains important

Strona 47 - Installation Site Checklist

Safety – General Safety Instructions2 Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598BGeneral safetyWARNING!All e

Strona 48 - *990-1598B*

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 3IntroductionWelcome to the Site Preparation and Installation Ma