APC AR201 Arkusz Danych Strona 1

Przeglądaj online lub pobierz Arkusz Danych dla Regały APC AR201. APC AR201 racks Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 2
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
2-Post Rack AR200 & AR201
990-6040A 1/2 6/00
NetShelter
®
®
Unpacking and Inspection
Before unpacking:
1. Inspect the carton for damage. If you detect damage, notify the carrier.
2. Remove the components from the carton and inspect them for shipping damage.
Note:
The mounting hardware is enclosed in a separate plastic bag located inside one of the packaging
inserts glued to the main carton. Remove it before discarding the carton.
Inventory
The following table lists the parts that are included with the NetShelter 2-Post Rack.
To o l s R e q u i r e d
You will need a 9/16" box-end wrench to assemble the rack.
Inventory of the NetShelter 2-Post Rack
Component Quantity
Rack
3" Extruded Upright Rail 2
1½" × 1½" Extruded Top Angle 2
3½" × 6" Extruded Bottom Angle 2
Hardware
3/8"-16 × ¾" Hex Head Bolt 12
3/8" Split Lock Washer 12
#12-24 Screw (for installing equipment) 24
Przeglądanie stron 0
1 2

Podsumowanie treści

Strona 1 - NetShelter

2-Post Rack — AR200 & AR201990-6040A 1/2 6/00NetShelter®®Unpacking and InspectionBefore unpacking:1. Inspect the carton for damage. If you detect

Strona 2 - Installation

2/2InstallationRefer to figures 1 and 2:1. Place the uprights on a flat surface, approxi-mately 20" apart, with the larger face of eachupright fa

Komentarze do niniejszej Instrukcji

Brak uwag