Introduction – General Safety Instructions
4Smart-UPS
®
VT 10-40kVA, 400V, Site Preparation and Installation Manual – 990-1986
WARNING!
When replacing a battery module, replace with the same number of the: APC SYBT1
(always replace a whole Battery Module at a time).
WARNING!
Only trained personnel familiar with the construction and operation of the equipment
and the electrical and mechanical hazards involved, may install and remove system
components.
CAUTION!
Wait until you are ready to power up the system before installing Battery Modules in the
UPS. Failure to do so can result in a deep discharge of the batteries and cause permanent
damage (for 10-20kVA systems, the time from the battery installation time till the UPS
is powered up should not exceed 75 hours or 3 days. For 20-40 kVA systems, the time
should not exceed 96 hours, or 4 days).
For configurations including customer-supplied external batteries, refer to
manufacturer’s battery installation and maintenance instructions.