Site Preparation (UPS and XR) – Installation Space Requirements
16 Smart-UPS
®
VT 10-40kVA, 400V, Site Preparation and Installation Manual 990-1986
Clearance for stand-alone 14in/351mm Enclosures
*) All physical installations must comply with local standards.
(C)
(A)
(D)
Stabilizing Bracket,
left and right
UPS
(B)
(G)
(E)
Space requirements in mm
Minimum clearance above UPS (A) 20 523
UPS depth (B) 36.4 925
UPS width 14 351
Minimum free rear space for ventilation* (D) 4 100
Minimum front clearance (E) 39.3 1000
Conduit Box, depth (F) 3.5 88
No side clearance required (add width of Stabilizing
Bracket for seismic protection if applicable)*
00
Stabilizing Bracket width 3.3 85
Total installation depth, inclusive of Front Panel, Conduit
Box and minimum front and rear clearances (G)
111 2025
For the stability of 14/351 mm stand-alone Enclosures, the Stabilizing Bracket must
always be mounted on both sides of the UPS. Follow the Seismic Anchoring procedures
for attachment.