APC NetShelter VX Dokumentacja Strona 20

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 44
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 19
NetShelter SX Enclosure: Unpacking, Installation, and Customization16
7. Remove the hinges from the door and reinstall them using the set of holes directly below where
they were originally installed.
8. Rotate the door 180 degrees and reinstall the door. See “Installing the doors” on page 13.
9. Reinstall the grounding wire at the top of the door, near the hinges, and to the enclosure frame
using the M6 x 12 pan-head screw and star washer.
10.Rotate the door handle assembly 180 degrees and reinstall it using the screws removed in step 2.
11. Reinstall the APC nameplate on the front door of the enclosure.
Przeglądanie stron 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 43 44

Komentarze do niniejszej Instrukcji

Brak uwag