Site Preparation (UPS and XR) – Installation Space Requirements
Smart-UPS
®
VT 10-40kVA, 400V, Site Preparation and Installation Manual 990-1986 15
Clearance for 20 in/523 mm Enclosures in installations including an XR Enclosure
*) All physical installations must comply with local standards.
Note
As seismic anchoring is carried out prior to wiring (and to busbar connection between
UPS and XR Enclosures if applicable), allow for sufficient working space behind the unit
for electrical work to be carried out (including busbar connections between Enclosures if
applicable).
(E)
(D)
(A)
UPS
XR
(B)
(G)
(C)
(C)
Space requirements in mm
Minimum clearance above Enclosures (A) 20 523
Enclosure depth (B) 36.4 925
Enclosure width (C) 20 (x 2) 523 mm (x 2)
Minimum free rear space for ventilation* (D) 4 100
Minimum front clearance (E) 39.3 1000
Conduit Box, depth (F) 3.5 88
No side clearance required (include width of Stabilizing Bracket
for seismic protection if applicable)*
00
Stabilizing Bracket width 3.3 85
Total installation depth, inclusive of Front Panel, Conduit Box
and minimum front and rear clearances (G)
79.7 2025