APC INROOM ACPSC3000 Instrukcje Operacyjne Strona 47

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 80
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 46
InRoom CW/DX – Operating Instructions
(8.3)
(14.4)
(19.1)
(26.8)
(8.3)
(15.9)
(20.7)
(26.8)
(4.3)
(9.1)
(9.1)
(4.3)
47
Chilled Water 40 kw 66 kW 90 kW 110 kW 150 kW
L 1/2 CW CW CW CW CW
L 3/4 CW CW CW CW CW
L 5/6 CW CW CW CW CW
L 7/8 - - - - -
R 1/2 CW - CW CW CW
R 3/4 CW CW CW CW CW
R 5/6 CW CW CW - -
R 7/8 - - - - -
Ø chilled water [inch]
[mm]
1 3/8
35
1 5/8
42
2 1/8
54
2 3/4
70*
6.3.3.2 Pipe entrance area - Upfl ow units - CW
On Upfl ow units the supply pipes and cables enter the left or right side through openings in the side wall of
the units.
connection from the left side connection from the right side
All dimensions in mm (in)
*Attention: For 110 kW and 150 kW units,
connect 64 mm (2 1/2 in) diameter piping to
the 70 mm (2 3/4 in) threaded fi tting using
a reducing fi tting.
Front of
Unit
Przeglądanie stron 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 79 80

Komentarze do niniejszej Instrukcji

Brak uwag