APC PD80G6FK1-M Instrukcja Obsługi Strona 27

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 96
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 26
990-1467C InfraStruXure System – Service Manual – Installation and Start-Up 19
Installation Procedures
Level the PDU, UPS, RDP, NetShelter and XR
Battery Enclosures
Leveling feet are attached under the enclosure at each corner. The leveling feet can help provide a stable
base if the selected floor space is uneven, but they are not intended to compensate for a badly sloped
surface. To level the enclosure:
1. Fit the 14-millimeter end of the open-ended wrench (provided) to the hex head just above the round
pad on the bottom of the leveling foot. Turn the wrench clockwise to extend the leveling foot until it
makes firm contact with the floor.
2. Repeat step 1 for each of the remaining leveling feet.
3. Use a level to determine which feet need further adjustment to level the enclosure. Adjust as
necessary.
Przeglądanie stron 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 95 96

Komentarze do niniejszej Instrukcji

Brak uwag