APC PD80G6FK1-M Instrukcja Obsługi Strona 49

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 96
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 48
990-1467C InfraStruXure System – Service Manual – Installation and Start-Up 41
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches (ATS)
Install a Rack ATS in the top of each enclosure for overhead wiring, and in the bottom of each enclosure
for wiring under the floor.
See the installation instructions in the manual included with your Rack ATS.
The Rack ATS is an optional component and not all InfraStruXure systems will include them.
Install the Rack Power Distribution Units (PDU)
Install Rack PDUs in the rear of the NetShelter VX enclosure, in the channel directly behind the rear
vertical mounting rails. For overhead wiring, make sure that the power cord is pointing toward the roof of
the enclosure. For under the floor wiring, make sure that the power cord is pointing toward the floor.
See the installation instructions in the manual included with your Rack PDU.
Install the InfraStruXure Manager and Hub (or Switch)
Install the InfraStruXure Manager in the enclosure closest to the InfraStruXure PDU. The CAT-5 data
cables included with your configuration are of varying lengths, based on the distance components will be
installed from the InfraStruXure PDU.
See the installation instructions in the manual included with your InfraStruXure Manager.
Install the Environmental Monitoring Unit or Environmental Management System
Install the Environmental Monitoring Unit or Environmental Management System according to the
installation instructions included with the device. The Environmental Monitoring Unit and
Environmental Management System are optional components and not all InfraStruXure systems will
include them.
Przeglądanie stron 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 95 96

Komentarze do niniejszej Instrukcji

Brak uwag