Appendix A : System OperationHow to Transfer the PRODUCT NAME NORMAL into Maintenance Bypass Operation
68 InfraStruXure System – Service Manual – Installation and Start-Up 990-1467C
Note: The H3 LED above the Q3 circuit breaker illuminates, indicating that it is safe to operate
the Q3 circuit breaker.
Note: The H2 LED above the Q2 circuit breaker illuminates, indicating that it is safe to operate
the Q2 circuit breaker.
2. Close (turn ON) the Q3 circuit breaker on the PDU.
If you have a dual-fed system, check to ensure that
power is available before operating the Q3 circuit
breaker.
3. Open (turn OFF) the Q2 circuit breaker on the PDU.
4. Set the UPS System Enable switch to the OFF
position.